Products List

Hot Blog

How Cooling Tower Fill Improves Heat Exchange Efficiency in Industrial Systems

How Cooling Tow...

As industries continue to focus on energ

How to Choose Cooling Tower Fill When Replacing Original OEM Parts

How to Choose C...

How to Choose Cooling Tower Fill When Re

Rising Demand for High-Performance Cooling Tower Fill Media in 2026

Rising Demand f...

The global cooling industry is experien

Wide-Width Film Fill for Counterflow Cooling Tower Applications

+86 17531813197

sam@fengbeiplastic.com

Sam

Wide-Width Film Fill for Counterflow Cooling Tower Applications

Our Cooling Tower Fill is available as a wide-format film fill solution for counterflow cooling tower projects requiring flexible fill dimensions. With width options from 1220mm to 1800mm, a 15mm pitch, and a 5.5° corrugated angle, the product can be configured for different fill pack requirements.

Designed Around Wide Fill Sections

The available widths include 1220mm, 1320mm, 1520mm, 1600mm, 1620mm, 1700mm, and 1800mm. This range gives project buyers several options when specifying fill for wider sections of a counterflow tower.

Instead of restricting the product to one standard dimension, the length and thickness can be customized. This allows the fill specification to be established around the actual requirements of the project.

15mm Pitch with 5.5° Corrugation

The fill uses a 15mm pitch and a 5.5° corrugated angle. These dimensions define the surface configuration of the film fill and provide a consistent product format for customers specifying compact-pitch cooling tower media.

The corrugated sheets are configured as fill media within the tower, providing the product format needed for film-type fill packs used in counterflow cooling applications.

Three Material Options

The product is available in PVC, CPVC, and PP. This material selection allows customers to specify the fill according to the requirements of their cooling tower project rather than being limited to a single material.

Material selection can therefore be considered together with the required dimensions, fill arrangement, and project specifications when preparing the final product configuration.

Glue or Hang Connection

Two connection methods are available: glue or hang. This provides additional flexibility when the fill is assembled into a complete fill pack and allows the connection method to be matched with the intended construction arrangement.

Customized Length and Thickness

While the product is offered in seven width options, both length and thickness are customizable. This makes the product suitable for projects with specific fill dimensions, including replacement applications where existing fill sections need to be matched.

The combination of wide width availability and customized dimensions also gives cooling tower manufacturers greater freedom when planning the final fill configuration for a project.

Product Specifications

Connection MethodGlue or Hang
Width1220mm, 1320mm, 1520mm, 1600mm, 1620mm, 1700mm, 1800mm
LengthCustomized
ThicknessCustomized
Pitch15mm
MaterialPVC, CPVC, PP
Angle5.5°

A Flexible Specification for Counterflow Cooling Towers

For counterflow cooling tower projects that require wide-format fill, this product combines multiple width choices with customizable length and thickness. The 15mm pitch, 5.5° angle, PVC, CPVC, and PP material options, together with glue or hang connections, provide a flexible specification for different Cooling Tower Fill requirements.

::

Anna Weber / Technical Manager

The cooling tower fill supplied by this company shows excellent chemical resistance and structural stability. We tested it under continuous industrial operation

Priya Sharma / Procurement Manager

We selected this supplier for a large-volume cooling tower fill purchase. Pricing was competitive and the customization options were flexible. The packing quali

Lucas Silva / Field Maintenance Technician

During on-site replacement of cooling tower fill, the installation process was smooth. The fill structure allowed easy handling even under limited maintenance t

Do you offer installation services?
We can recommend certified installation partners worldwide. On-site supervision by our engineers cooling tower fill media.
What is the usual delivery time for cooling tower ...
Standard lead time is around 5–7 weeks after order confirmation, varying with order volume and customization requirements. Faster production schedules may be arranged when needed.
Is the cooling tower fill media fire rated?
Yes, standard PVC cooling tower fill media is tested with a 1.5-hour fire resistance rating under ASTM E84. Higher performance and enhanced fire-resistant options can be provided upon project requirem
What thermal and airflow conditions can your cooli...
Our cooling tower fill media is typically designed for continuous operation up to 55°C with optimized air distribution efficiency. Customized thermal resistance and performance layouts can be develope

PROFESSIONAL COOLING TOWER FILL MEDIA MANUFACTURER | QUALITY & PERFORMANCE ASSURANCE

Blog

Cooling Tower Fill Media industry updates and technical insights for global clients.

Contact Us

Get in touch with our team for cooling tower fill media details, quotations, and project technical support.

Chat on WhatsApp